Fowler & Hammer Logo

608-782-6849
info@fowlerhammer.com



Fowler & Hammer General Contractors Logo
Bangor Middle/High School
Location:
Bangor, WI
Size:
90,000 sq. ft.
Architect:
SDS Architects
A 90,000 SF single story Middle/High School combined with district offices. The building structure is brick façade with a bar joist and metal deck roof system. A combined cafeteria/auditorium is connected to a full service kitchen. Football, baseball, and track fields were also included along with a Boston Square gym floor.